Complete Guide to Setting Up Utilities at Your New Home
When moving, the process of setting up electricity, gas, water, and internet can save you enormous effort if you know the right sequence. From application methods for each utility to important tips during busy seasons, we've compiled the essential knowledge you need for a smooth start to your new life.
Overview of Utility Setup Procedures to Confirm Before Moving
When moving to a new home, you need to complete procedures for electricity, gas, water, and internet in advance so you can live comfortably from your move-in day. Since each utility has different application timings and opening days, it's important to manage them together.
•Electricity: Apply 2 weeks to 3 days before move-in. Service is typically activated on the application day or the next day
•Gas: Apply by 1 week before move-in. Service activation requires your presence, with visits typically on weekdays
•Water: Apply by 1 week before move-in. In most cases, only paperwork is required and your presence is not needed
•Internet: Apply 1-2 months before move-in. Fiber-optic lines require installation work that can take 1-2 months
Managing these individually often leads to oversights, so we recommend creating a checklist to manage them all together.
How to Apply for Electricity and Important Points to Note
For electricity, you need to cancel your current address and set up service at your new address.
Application Method
You can apply through each electric company's official website or by phone. Since the electricity market was deregulated in 2016, you can switch not just to the regional major power company but also to new power companies. It's a good idea to compare and choose a company that matches your lifestyle, considering rate plans and renewable energy ratios.
Information Needed for Application
•New address and move-in date
•Meter point identification number (noted on meter reading slips or near your circuit breaker)
•Payment method (bank account number or credit card information)
Points to Note
After application, electricity can typically be activated without your presence. However, if a property has been vacant for a long time, the breaker may simply be turned off, and in most cases you can restore power by flipping the breaker yourself on the day before move-in or on move-in day.
How to Apply for Gas and Tips for Scheduling Your Presence
Gas requires the most attention among all utilities. A technician must be present when the service is activated, and if you can't get an appointment, you may not be able to use gas on your first day.
Application Method
Contact the gas company (for city gas, contact your regional supplier; for propane, confirm with the property management company or landlord) by phone or website. Check the property's equipment specifications or contact the management company to determine if it's city gas or propane.
The Appointment Process
Reserve your preferred visit date and time when applying
A technician visits and opens the gas meter valve
Safety checks are performed on all gas appliances in the unit
Once everything checks out, service activation is complete
The process typically takes about 30 minutes. Since all gas appliances (stove, water heater, etc.) must be installed when the technician arrives, scheduling the appointment after furniture has been moved in is ideal.
Strategies for Busy Seasons
March and April are peak moving seasons, and gas company appointments fill up quickly. We strongly recommend booking 2-3 weeks in advance during this time. Weekday mornings tend to have more available slots.
Water Service Setup and Timing for Canceling at Your Previous Address
Unlike electricity and gas, water service is managed by the water bureau or designated contractor in your new city or ward.
Application Method
Apply for service activation through the water bureau's website or by phone in your new city. Many municipalities allow online applications and don't require your presence for activation. However, some areas may require an appointment, so confirm in advance.
Canceling Service at Your Previous Address (Closing)
Apply to close water service at your current address on your move-out date. Aim to submit the closure request by one week before move-out. The management company may confirm this during the move-out inspection, but you need to contact the water bureau yourself.
Billing and Settlement
Water bills are typically read every two months, and you'll receive a prorated bill when you move out. You can confirm the settlement amount on the notice sent from the water bureau.
Internet Service Should Be Your Top Priority
Internet service takes the longest to activate among all utilities. In particular, fiber-optic lines require both external building work and indoor installation, and it's not uncommon for activation to take 1-2 months from application.
Types of Service and Their Features
•Fiber-optic lines (Flets Hikari, au Hikari, etc.): Fast and stable. While installation costs apply, they're economical for long-term use
•Home routers (WiMAX, SoftBank Air, etc.): No installation required and available immediately. Speed may be slightly lower than fiber-optic
•Mobile Wi-Fi: Available immediately after signing up. Convenient as a temporary solution right after moving
Important Notes When Changing Providers
If you're switching fiber-optic providers, you may face cancellation fees on your old contract. Check your contract renewal date (the end of your minimum commitment period) before canceling.
Also, in apartment buildings, the speed depends on whether the building uses VDSL or fiber-optic distribution methods, so it's best to confirm with your management company.
If your new place is in an apartment building and fiber-optic lines have already been brought into the building, you may be able to choose a "Mansion Plan" that requires no installation work and offers lower rates. Confirming this before moving will make the application process smoother.
Timeline Checklist to Avoid Delays During Peak Moving Season
During peak moving season (late February to early April), all procedures can be expected to be crowded. Use the following timeline as a guide and prepare with plenty of time in advance.
2 Months Before Move-in
•Apply for internet service (for fiber-optic lines)
•Confirm when to cancel your current service
1 Month Before Move-in
•Schedule your gas appointment
•Compare and choose your electric company
•Confirm water service procedures
2 Weeks Before Move-in
•Apply for electricity
•Apply for water service activation
•Contact current service providers to cancel gas, electricity, and water
Move-in Day
•Check the breaker (restore electricity)
•Gas appointment (be at home at your scheduled time)
•Test that all utilities are working properly
The key to successfully setting up utilities is acting early, even before your actual move. Gas and internet are particularly prone to issues like "couldn't get an appointment" or "installation didn't happen in time," so we recommend starting as soon as you've found your new home. With good planning and preparation, you can start your new life comfortably from day one. If you're looking for rental properties in Sendai, try searching on sumuie with your preferred criteria.